Risk Assessment of Road Flood in Ya'an City, Sichuan Province

More Information
  • Received Date: 29/01/2015
    Available Online: 20/10/2018
  • MSC: X43

  • Road floods have happened frequently in the past few years and caused great losses in the economy of Sichuan province. To assess the risk of road floods, a study was made with Ya'an as the study area. Based on failure mechanisms and forms of road floods, and taking into consideration flood-causing factors, flood-developing environment, hazard-affected bodies and flooding factors, an index system of risk assessment for road flooding was constructed, which consisted of 11 relevant and pertinent indicators. Using the AHP-entrophy method and the theory of fuzzy probability, a risk assessment model was built and a map of risk of road floods in Ya'an city was drawn. The results of road flood hazard zoning divided Ya'an into a high-medium-risk area, a medium-high-risk area, a medium-low-risk area and a low-risk area. Of the four areas, Yucheng district, the central urban area of Ya'an with a well developed economy, was shown to have the highest road flood risk, followed in sequence by Mingshan, Baoxing and Lushan. These results were consistent with the actual losses of road floods in the past 3 years.
  • 加载中
  • [1] 曾蓉, 陈洪凯, 李俊业.熵权模糊综合评价法在公路洪灾危险性评价中的应用[J].重庆交通大学学报(自然科学版), 2010, 29(4):587-591.

    Google Scholar

    [2] CAI H, RASDORF W, TILLEY C. Approach to Determine Extent and Depth of Highway Flooding[J]. Journal of Infrastrure Systems, 2007, 13(2):157-167. doi: 10.1061/(ASCE)1076-0342(2007)13:2(157)

    CrossRef Google Scholar

    [3] XIA J Q, FALCONER R A, LIN B L, et al. Numerical Assessment of Flood Hazard Risk to People and Vehicales in Flash Fioods[J]. Environmental Modelling, 2011, 26(8):987-998. doi: 10.1016/j.envsoft.2011.02.017

    CrossRef Google Scholar

    [4] 陈远川, 陈洪凯.山区沿河公路路基洪水毁损过程及机理研究[J].公路, 2012, 11:95-103.

    Google Scholar

    [5] MOHAMMADKHAN S, AHMADI H, JAFARI M. Relationship Between Soil Erosion, Slop, Parent Material, and Distance to Road (Case Study:Latian Watershed, Iran)[J]. Arab J Geosci, 2012, 4(1-2):311-338.

    Google Scholar

    [6] 唐红梅, 廖学海, 陈洪凯.基于模糊概率的阿坝州公路洪灾孕灾环境分区[J].灾害学, 2014, 29(4):52-56. doi: 10.3969/j.issn.1000-811X.2014.04.011

    CrossRef Google Scholar

    [7] APEL H, THIEKEN A H, MERZ B, et al. Flood Risk Assessment and Associated Uncertainty[J]. Natural Hzaards and Earth System Sciences, 2004, 4(2):295-308. doi: 10.5194/nhess-4-295-2004

    CrossRef Google Scholar

    [8] 黄大鹏, 刘闯, 彭顺风.洪灾风险评估与区划研究进展[J].地理科学进展, 2007, 26(4):11-21. doi: 10.3969/j.issn.1007-6301.2007.04.002

    CrossRef Google Scholar

    [9] 林孝松, 陈洪凯, 王先进, 等.西南地区公路洪灾孕灾环境分区[J].长江流域资源与环境, 2012, 21(2):251-256.

    Google Scholar

    [10] 李帅杰, 李昌志, 程晓陶.区域洪灾风险评估方法初探-以浙江省为例[J].水利水电技术, 2012, 43(3):82-87. doi: 10.3969/j.issn.1000-0860.2012.03.022

    CrossRef Google Scholar

    [11] 刘家福, 李京, 梁雨华, 等.亚洲典型区域暴雨洪灾风险评估研究[J].地理科学, 2011, 31(10):1266-1271.

    Google Scholar

    [12] 牛全福.基于GIS的地质灾害风险评估方法研究-以"4. 14"玉树地震为例[D].兰州: 兰州大学, 2011.

    Google Scholar

    [13] 段生荣.典型小流域山洪灾害临界雨量计算分析[J].水利规划与设计, 2009(2):20-22. doi: 10.3969/j.issn.1672-2469.2009.02.008

    CrossRef Google Scholar

    [14] 覃庆梅, 林孝松, 唐红梅, 等.重庆市万州区公路洪灾孕灾环境分区[J].重庆交通大学学报(自然科学版), 2011, 30(1):89-94.

    Google Scholar

    [15] SINHA R, BAPALU G V, SINGH L K, et al. Flood Risk Analysis in the Kosi River Basin, North Bihar Using Multi-Parametric Approach of Analytical Hierarchy Process(AHP)[J]. Journal of the Indian Society of Remote Sensing, 2008, 36(4):335-349. doi: 10.1007/s12524-008-0034-y

    CrossRef Google Scholar

    [16] 马国荣, 杨申琳.基于物元分析的AHP确定指标权重系数方法[J].长安大学学报, 2003, 23(5):117-119. doi: 10.3321/j.issn:1671-8879.2003.05.032

    CrossRef Google Scholar

    [17] 卿清涛, 徐金霞, 马振峰, 等.四川盆地区雾霾灾害风险区划初探[J].西南大学学报(自然科学版), 2017, 39(9):145-152.

    Google Scholar

    [18] 汪国懋.基于层次分析法的水利PPP项目风险评价[J].重庆理工大学学报(自然科学版), 2016, 30(9):156-160. doi: 10.3969/j.issn.1674-8425(z).2016.09.026

    CrossRef Google Scholar

    [19] 李存斌, 张益.基于三角模糊数的电力企业科研风险模糊综合评判[J].重庆理工大学学报(自然科学版), 2017, 31(1):143-151.

    Google Scholar

    [20] 刘章军, 叶燎原, 彭刚.砂土地震液化的模糊概率模型[J].岩土力学, 2008, 29(4):876-880. doi: 10.3969/j.issn.1000-7598.2008.04.004

    CrossRef Google Scholar

  • 加载中
通讯作者: 陈斌, bchen63@163.com
  • 1. 

    沈阳化工大学材料科学与工程学院 沈阳 110142

  1. 本站搜索
  2. 百度学术搜索
  3. 万方数据库搜索
  4. CNKI搜索

Figures(1)  /  Tables(4)

Article Metrics

Article views(906) PDF downloads(101) Cited by(0)

Access History

Risk Assessment of Road Flood in Ya'an City, Sichuan Province

Abstract: Road floods have happened frequently in the past few years and caused great losses in the economy of Sichuan province. To assess the risk of road floods, a study was made with Ya'an as the study area. Based on failure mechanisms and forms of road floods, and taking into consideration flood-causing factors, flood-developing environment, hazard-affected bodies and flooding factors, an index system of risk assessment for road flooding was constructed, which consisted of 11 relevant and pertinent indicators. Using the AHP-entrophy method and the theory of fuzzy probability, a risk assessment model was built and a map of risk of road floods in Ya'an city was drawn. The results of road flood hazard zoning divided Ya'an into a high-medium-risk area, a medium-high-risk area, a medium-low-risk area and a low-risk area. Of the four areas, Yucheng district, the central urban area of Ya'an with a well developed economy, was shown to have the highest road flood risk, followed in sequence by Mingshan, Baoxing and Lushan. These results were consistent with the actual losses of road floods in the past 3 years.

  • 近年来四川经历了多次大范围、强降雨的极端降雨天气,导致山洪及次生灾害的发生,对地区社会经济尤其是对公路设施和交通运输安全造成了严重的影响.公路洪灾已成为影响公路交通完好、畅通最主要的灾害,给社会造成极大的经济损失[1].目前,对公路洪灾造成经济损失的风险评估工作不足[2-3],大量研究工作还主要停留在公路洪灾致灾机理[4-5]、孕灾环境[6]和危险性分析[7]等方面.因此,有必要开展公路洪灾的风险管理工作,为公路的防灾减灾工作提供参考,将公路洪灾风险最小化.

    从系统的角度来看,洪灾风险由洪灾危险性、洪灾易损性和洪水灾害灾情共同构成[8].风险评估指标具有多样性,不同的学者针对研究对象选择了相应的评价指标对公路洪灾风险性的安全等级进行了评价分区,但风险评估主要从致灾因子、孕灾环境、承灾体和灾情因子4个方面加以考虑,如曾蓉[1]、林孝松[9]等针对公路洪灾风险的复杂性、模糊性及不确定性特征,遴选了地貌条件、暴雨强度等公路洪灾风险评估指标;李帅杰等[10]则从洪水灾害风险的原理和区域防灾力等要素出发,遴选经济、洪水等指标进行洪灾风险等级划分;而刘家福等[11]基于洪灾风险基本原理,考虑了土地利用、植被等主要指标,利用定性及定量综合分析方法对亚洲洪灾风险进行综合评价.除评价指标不统一外,评价方法也有多种模型,如牛全福[12]基于GIS技术对地质灾害风险评估方法进行了研究;段生荣[13]在大量山洪灾害调查的基础上,采用实测雨量分析法、降雨灾害频率分析法和产汇流分析法对比进行山洪灾害临界雨量的确定,根据典型流域洪水计算成果,确定划分典型流域的风险区.

    综上可知,风险评估工作具有较强的专业性、指标选取具有多样性、评价方法也具可变性等特征,前人大量的研究为公路洪灾的研究奠定了基础.公路洪灾对四川省社会经济造成严重的影响,雅安是全川多雨中心,其遭受的公路洪灾损失情况尤为突出.据四川省交通运输厅公路局资料统计,仅2012-2014年雅安市共遭受60余次公路洪灾,不仅对当地交通运输造成了严重影响,同时也造成当地巨额的经济损失.因此,以四川省雅安市公路洪灾为研究对象,依据公路洪灾致灾机理、破坏形态等方面分析,遴选出路面拔河高度等11个评价指标,并获取各指标数据按既定标准分级赋值构成评价指标体系,然后运用模糊概率综合评价模型对雅安市公路洪灾风险进行区划.该研究工作对雅安等四川地区的公路洪灾风险评估及灾害管理工作具有借鉴意义.

1.   研究区概况
  • 雅安市位于四川盆地西缘,青衣江上游,是青藏高原向成都平原的过渡地带.雅安市幅员面积1.53×105 km2.全市地形呈北、西、南地势高而东部和中部地势较低的地理格局.市域境内以山地为主,其中西南、西北部的极高山和高山占全市面积的21%左右,中、低山地约为总面积的73%,丘陵、平坝占总面积的6%,主要集中于河谷两侧.境内最高海拔达5 793 m,与最低处相对高差达5 166 m.雅安属内陆亚热带季风性湿润气候,区内雨量充沛,多年年均降雨量南北差异显著,北部多在1 000~1 800 mm之间,南部仅800 mm左右.降雨最多的是雨城区、天全一带,最多可达2 000 mm左右,为全川多雨中心,素有“雨城” “雅安天漏”之称.全市植被条件好,森林覆盖率达50.79%.雅安市经济发达、交通便捷,2013年实现地区生产总值(GDP)417.97亿元,公路总里程达到6 980 km,路网密度达到0.456 km/km2.境内构造地貌发育充分,地质构造运动强烈,断裂带纵横交错,曾于2013年发生7.0级地震,对境内公路设施等造成严重的破坏.诸多因素的影响,使得公路洪灾成为了一个不可忽视的灾害类型,对当地经济建设的发展带来了颇为严重的影响.

2.   评价指标及数据来源
  • 公路洪灾风险评估是洪灾危险性与承灾体易损性对抗耦合对抗的综合表现.公路洪灾的发生是众多自然因素耦合作用的结果,在已有公路洪灾评价文献中对评价指标没有统一限定,不同研究者均因地制宜地选取典型指标对公路洪灾风险性进行评价.但在风险评估工作中,应包括孕灾环境、致灾因子、承灾体因子和灾情因子四方面内容.地形条件、地质地貌特征及气候状况是导致公路洪灾的3个主要因素[14].根据公路洪灾致灾机理[4-5]和相关文献[1, 5-14],在遵循系统性、灵活性、针对性、实用性和综合性指标选取原则的基础上,从孕灾环境、致灾因子、承灾体因子和灾情因子4个方面考虑,遴选出地貌条件(u1)、地质条件(u2)、植被覆盖度(u3)、年均降雨量(u4)、暴雨强度(u5)、潜在公路洪灾里程(u6)、路网密度(u7)、路面拔河高度(u8)、等级公路比率(u9)、GDP总值(u10)和公路造价(u11)共11个指标构成公路洪灾评价指标体系(表 1).其中,指标体系参考评价模型分为极高、高、中和低4个风险等级,各等级阈值依据致灾机理、相关文献和专家意见及评价模型等综合确定.

  • 本文各指标数据来源:(1)依据《中国地貌图制图规范》将地貌分为平原/高原、丘陵、中山、高山/极高山4种类型;(2)地质条件是一个多元指标,主要包含地质构造、地层岩性、水文地质条件等因素,通过GIS技术采集地质条件因素信息后叠加,根据叠加情况赋予地质条件好、中、差、极差4个等级.如断裂构造、节理发育的岩层受挤压或因节理(裂隙)切割而形成破碎地带,岩土体松散,在致灾指标作用下极易引发灾害,潜在公路洪灾的可能性最大.相反,岩层水平、岩体完整性好的地区,在相同致灾指标作用下孕灾因素弱,界定为低易发区等级. (3)植被覆盖度信息通过林业局、区县《林业志》及土地利用情况获取;(4)年均降雨量和暴雨强度通过气象局资料获取;(5)根据研究区的交通地图和地貌、水系图等,结合公路洪灾发生比例(国道、省道、县道发生的比例为1:7:12)和研究区公路里程,计算潜在的公路洪灾里程;(6)路网密度、等级公路比率和公路造价通过《2013年四川交通统计年鉴》等资料获取;(7)借助GIS技术,将河流水系进行200m缓冲,将缓冲区与沿河公路叠加,获取沿河公路路面拔河高度信息;(8)通过《2013年四川经济年鉴》查询GDP总值数据.

    按照上述办法获取11个公路洪灾风险评估指标原始数据,依据表 1中的公路洪灾风险性评价指标分级赋值标准,按公式(1)对指标进行量化赋值.

    式中,ui为指标的量化赋值;a为各指标区间的下限赋值;a为各指标区间的上限赋值;x为指标的原始数据;b为各指标区间的下限值;b为各指标区间的上限值,11个指标分级赋值后的数值如表 1u1~u11所示.

3.   评价技术与方法
  • 模糊概率综合评价模型是以层析分析法[15-18]和模糊概率[1, 6, 19-20]为基础,分析具有模糊、复杂等特性的公路洪灾风险评估目标的众多影响因素,通过两两比较判断等确定指标权重,结合模糊概率评价模型对公路洪灾风险性进行评价.

  • 在多指标综合评价中,指标权重分配不同会直接导致评价对象优劣顺序的改变,但权重值的合理性、准确性直接影响评价结果的可靠性.层次分析法[7]能较好地处理无法定量而又不可回避的决策因素,它综合考虑了评价指标体系中各层因素的重要程度而使各指标权重趋于合理.因此,采用层次分析法确定公路洪灾评价指标权重具有合理性和可行性.公路洪灾影响因素众多,将上述选取的11个评价指标,根据各自对公路洪灾的影响程度,采用九标度打分法进行两两比较以构建判断矩阵.其中,通过研究发现,11个指标对公路洪灾风险性的重要性程度排序依次为:GDP总值、公路造价、路面拔河高度、等级公路比率、路网密度、暴雨强度、潜在洪灾公路里程、年均降雨量、地貌条件、地质条件、植被覆盖度.经层次分析法及专家校核后的公路洪灾风险评估指标权重系数(wi)如表 2所示.

  • 公路洪灾风险评估的模糊矩阵集合U={u1u2,…,u11}和指标权重系数W={w1w2,…,w11}(表 2)已经确定,根据公路洪灾情况,运用模糊概率统计法选取公式(2)-(4)的梯形与半梯形隶属函数:

    式中,aik(i=1,2,…,11;k=2,3)为指标的等级划分标准值,具体取值可由表 1获取.

    依据模糊事件的概率公式(5)求出各危险等级的模糊概率P(Aj):

    由信息集中原则,求取危险性的评价结果:

    σj最大值对应的J确定危险性等级,为分级更加精细,参照σj与相邻σj±1的距离大小进一步确定亚类.即:以σj最大值对应等级J为参考,当σj接近于σj-1时,确定为较安全亚类;当σj接近于σj+1时,确定为较危险亚类;若有σj-1σj+1相同时,根据就高原则确定为较危险档亚类.

4.   雅安市公路洪灾风险区划与分析
  • 根据公路洪灾风险评估指标获取方法,结合雅安当地公路洪灾条件及历史灾情,获取各评价指标原始数据,并根据表 1分级赋值标准量化以获取公路洪灾风险评估数据,在此基础上结合层次分析法确定的权重系数和模糊概率综合评价模型,经过计算、归一化处理后的雅安市各县的信息集中值σj(j=1,2,…,4)和风险性等级结果如表 3图 1所示.其中亚类的确定,如雨城区最大σj值为σ3=0.39,即雨城区为高风险区;σ2=0.30,说明中风险等级占有较高比重而不应忽视.为更详细具体地对风险性分区,将雨城区的风险等级确定为高风险等级偏向于中风险等级,简称高中风险亚区.

    表 3可知,雅安市公路洪灾风险性包括高、中、低3个风险等级,以中风险等级为主,有5个行政单位,包括中高风险亚区的名山、荥经、汉源、石棉和中低风险亚区的天全县,占总面积的65.04%.高风险区的雨城区和低风险区的芦山、宝兴县分别占总面积的6.99%和27.97%.

    从研究区公路洪灾风险分区图(图 1)来看,高、中风险区分布于雅安大部地区,其中高风险区位于经济最发达的雨城区;低风险区则分布在雅安北部地区的宝兴县和芦山县.值得说明的是,鉴于公路洪灾定义限定,本文未将“4·20”地震引发的公路灾害纳入研究,而是只限于降雨作用引起的公路灾害情况.根据四川省交通运输厅公路局路况统计信息资料,获取的雅安历史上的公路灾害情况来看(表 4),除芦山县、雨城区和名山县发生公路洪灾频次较小外,其余区县的公路洪灾频次较高.但是由于公路洪灾风险评估考虑的是洪灾与灾情因子的耦合情况.从表 4中可知,低风险区的芦山县和宝兴县遭受公路洪灾后的一次经济损失小;相反,雨城区、汉源县等遭受公路洪灾后经济损失较为严重,这与当地经济发展和交通运输量相关.风险分区结果与实际的公路洪灾发生情况吻合较好,进而说明本文的评价模型正确合理,对相近地区的公路洪灾风险评估具有一定的借鉴意义.

5.   结论
  • 本文以雅安市公路洪灾为研究对象,参照公路洪灾破坏形态、致灾机理和指标遴选标准,从孕灾环境、致灾因子、承灾体和灾情因子四方面遴选出地貌条件等11个指标,通过ArcGIS等方法获取指标数据,分级赋值后对雅安市的公路洪灾风险性以区县为单位进行划分,根据指标对公路洪灾的重要性程度排序,采用层次分析法确定评价指标的权重系数,运用模糊概率综合评价模型对雅安市的公路洪灾风险进行评估.结果表明:雅安市公路洪灾风险性被分为高中风险亚区、中高风险亚区和中低风险亚区、低风险区四档三级.经济发达的雨城区的公路洪灾风险性较高,名山及西南部区县次之,而宝兴等经济欠发达地区的公路洪灾频次虽然较高,但风险性较小;评价分区结果与近3年的公路洪灾统计分布结果相符,进而说明该综合评价模型实用合理,评价结果有一定的科学性和参考价值,可作为该区公路管理部门防治公路洪灾的理论参考依据.